It really was time to make the move, meanwhile our rented accommodation will be kept on until the natural end of the lease.
There are a couple of reasons for this, the main one being we have no idea how much water we use but do know the major uses are doing the washing and showering. So for now the washing and showering is being done at the rented place. Hopefully by the time we have finished the inside showers and the final water tank is in place and connected we will start to have the Autumn rains.
The designated day arrived as did the really hot weather, I would not recommend moving when the mercury is showing high 30's. Deb and Robert (Fred was supervising) arrived early and very kindly helped us shift the really heavy stuff. Three trailer and pick up loads later and most of our chattels are here. Just some of the clothes and sundries left to shift and a lot of unpacking and sorting out to do.
No matter we are finally here and I have to say it really does feel like we have found the end of the rainbow.
If that hasn't been excitement enough Rick has finished the outside shower, YAY, all bar the floor tiles and I think you'll agree has done an amazing job.
Attaching the shower head to a series of copper pipes which Sid (the builder) first thought was Ricks trombone!
| Fred doing final inspection of the drain pipe |
And finally the inaugural shower
Ricks final touch, for now, was the hanging the maiden hair fern. Natural grey slate will be used for the floor so we are doing our best to keep the concrete as grease free as possible.
And then the new concrete water tank arrived......
Backed into place
Rick controlling the winch and tipper, John the deliverer used two very thick steel poles as rollers.
Slowly the really heavy tank slid off the lorry and settled perfectly onto the pad Rick had prepared earlier.
Just need the plumbers back now to fit up the South side down pipes... then bring on the rain.
And then we had 'fun' with the telephone and internet connection.....
We patiently waited for the chap to transfer the phone and internet connection from our rented place to here... and waited and waited. Eventually we got a massage (wishful thinking!) we actually got a message to say the appointment had been cancelled and it would be done in a couple of days time. Well many conversations later we still haven't got a phone.
The original electricians told us they could put in the phone connection, unfortunately unbeknown to us they ran the line from the house to the nearest stobie pole. Which (for those not in the know) is where our electrics run to. And therefore a very dangerous place for anyone to work, should the electrics fail for any reason the person working underneath could be electrocuted! So we now have obsolete telephone points in the house.
We have held off on the telephone connection as we may have to run the whole thing through our internet connection the signal for which has yet to be checked out. Are you still with me?
So now we have a temporary internet connection which can be topped up like a mobile phone, which hopefully bodes well for the permanent connection. Fingers crossed..... and deep breath!